Termed “End of Line”, this system included a cycling skid system on an upper supply and lower return conveyor system. This system included two final component test perimeters, leaktest and gauging. These fixtures were included but not designed by BMD due to time constraints. The rest of the facility, including skid transfer conveyors, skid lift and lower mechanisms, support structures etc were designed by BMD in late 2008.